Inspection procedures

4.2.1
Introduction
Inspection procedures include preventative visual controls, monitoring and measuring work
before and during commissioning. Inspection procedures enable changes to the low and
high-pressure stage to be detected. Engine damage can be prevented.
4.2.2
Checks before commissioning
Filter mat (if available)
Check for damage and contamination.
u
Lubricating system
CAUTION
Contaminated oil
Serious damage to engine or property can be caused by dirt and solid ma-
terial particles in the oil.
For the initial commissioning phase and after all service work, flush the
u
complete lubricating system with warm oil.
Use special running-in filters when running in the engine and after all ser-
u
vice work on the lubricating system.
Check that the oil filter is clean before commissioning.
u
Check the oil pressure in the oil supply pipes.
u
Warning plates
Check whether warning plates are present and legible.
u
Check whether the protective sheets have been removed from new warning plates.
u
4.2.3
Checks after commissioning (engine in idle mode)
Lubricating system
Check the oil pressure in the oil supply pipes.
u
Check oil inlet temperature.
u
The admissible values are specified in chapter
© Copyright 2022 ABB. All rights reserved.
Monitoring during operation
HZTL4069_EN
→38.
Rev.F
March 2022

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power2 845-m46

Table of Contents