Table 19: Cleaning Parameters Hp; Table 20: Cleaning Parameters Lp; Table 21: Holding Time - ABB PT004162 Operation Manual

Table of Contents

Advertisement

Operation Manual / Power2 845-M / High-pressure stage
7 Periodic maintenance / 7.3 Cleaning turbine and nozzle ring during
operation
2. Cleaning the high-pressure turbine stage (HP stage)
If present, open the drain pipe in the low-pressure stage during cleaning.
u
Switch the 3-way valve during cleaning from scavenging air to water supply.
u
Carry out the cleaning process with cleaning parameters according to the specifications
u
in the following table.
Power2
Water flow rate
[l/min]
845 HP
14.5 ±1.0
Table 19: Cleaning parameters HP
For an optimum cleaning result, the water flow rate adopted when designing the cleaning
process should be set via the corresponding control valves and monitored by a flowmeter. If
this is not possible, the specified water pressure at the cleaning connection of the tur-
bocharger is to be set as a rough approximation.
3. Cleaning the low-pressure turbine stage (LP stage)
If present, open the drain pipe in the low-pressure stage during cleaning.
u
Switch the 3-way valve during cleaning from scavenging air to water supply.
u
Carry out the cleaning process with cleaning parameters according to the specifications
u
in the following table.
Power2
Water flow rate
[l/min]
845 LP
14.5 ±1.0
Table 20: Cleaning parameters LP
For an optimum cleaning result, the water flow rate adopted when designing the cleaning
process should be set via the corresponding control valves and monitored by a flowmeter. If
this is not possible, the specified water pressure at the cleaning connection of the tur-
bocharger is to be set as a rough approximation.
4. Drying phase
Maintenance of the holding time according to the specifications in the following table
u
and subsequent adjustment of the desired engine operating point.
Power2
845
Table 21: Holding time
Repetitions of wet cleaning
The repeating of cleaning cycles one immediately after the other must be avoided as this
can lead to excessive mechanical stress, hence reducing the operating life of the compon-
ents.
The action of the cleaning water on the peripheral units (such as boiler) must be clarified by
the operator.
© Copyright 2022 ABB. All rights reserved.
Water pressure
(guideline value)
[bar]
3.0
Water pressure
(guideline value)
[bar]
1.5
Holding time at reduced load
[min]
≥10
HZTL4069_EN
Duration of water injection
[min]
10
Duration of water injection
[min]
10