Download Print this page

WaterUps Oasis 1680 Wicking Bed Assembly Manual page 4

Advertisement

®
To fit the WaterUps
Inlet Pipe you must
first cut a hole in the top of one of the
WaterUps
®
Cells.
Using a sharp knife cut along the circular
groove around the type on the top of the
WaterUps
®
Cell as shown in the image
below.
The three tabs on the bottom of the
water inlet pipe must lock into the three
holes in the top of the WaterUps
Apply some pressure to the inlet pipe as
you insert it, until it clicks into place in
the WaterUps
®
Cell.
Contact Us
Sales
Email: sales@waterups.com.au
Phone: 1300 205 550
The WaterUps
®
website is owned and operated by
WaterWix Pty Ltd – ABN 58 166 973 011.
The information contained in this document is provided
as is and without any warranties of any kind, whether
expressed or implied. Users are advised to make their own
determination as to the suitability of this information
Place all remaining WaterUps
position and fold down the flaps on top
of the reservoir liner.
4. Adding perlite to the feet of the
WaterUps
®
Adding Perlite to the 'wicks' will improve
airflow through to the soil. Both fine and
medium grain perlite work effectively for
this purpose.
The wicks, which are the 4 feet at the
base of each cell, should all be filled with
perlite.
You will need 20 litres of Perlite for your
Oasis 1680 Wicking Bed.
®
Cell.
5. Add potting mix or soil to the
wicking bed.
You will now need 16 x 25 litre bags of
good quality potting mix or potting soil to
fill the Oasis 1680 Wicking Bed.
For more information please refer to our
Soil Considerations Guide which you will
find on our Getting Started page. You
can go to it using the link or QR code at
the bottom of page 1.
General Enquiries
Email: info@waterups.com.au
in relation to their particular purpose or specific
circumstances. No responsibility can be accepted by
®
WaterUps
, WaterWix Pty Ltd, or its staff for any loss
resulting from any action taken or reliance made by
you on any information contained in this document.
®
cells in
Cell.
6. Watering your wicking bed.
To water your bed simply insert a garden
hose into the inlet pipe and fill the water
reservoir until water starts flowing out of
the overflow pipe. Replace the cap when
done.
The water reservoir of your bed will hold
140.8 litres of water. How often you need
to refill the reservoir will depend on what
plants you are growing, the time of year,
and the amount of natural rainfall that
you receive. However, in our experience,
periods of up to four weeks are
achievable before you will need to refill
your wicking bed.
It is recommended that you allow the
water level in the bed to go down to at
least 1/4 full before refilling. This will
assist soil aeration.
To check how much water is in the
reservoir simply use a dipstick or set
up a moisture sensor system.
Account Enquiries
Email: accounts@waterups.com.au
Copyright © 2022 WaterWix Pty Ltd. All rights reserved.
WaterUps, the WaterUps Logo and Wicking our World
are registered trademarks of WaterWix Pty Ltd.
Published: 5 April 2022

Advertisement

loading

This manual is also suitable for:

14050peuc14050sg/sg14070wall14040wood