Download Print this page

WaterUps Oasis 1680 Wicking Bed Assembly Manual page 2

Advertisement

Contents
1 x Corner Panel with the
3 x Corner
1 x WaterUps
®
1680 Reservoir Liner
6 x Wall Panels
hole for the overflow pipe
Panels
4 x Right-side Corner Rails
4 x Left-side Corner Rails
4 x Connector Rails
4 x End Rails
1 x Overflow Pipe & spacer
1 x bag of screws
8 x WaterUps
®
Wicking Cells
1 x Inlet Pipe and Cap
You will need
Approximately 3 square metres of
level ground to build on.
No. 2 Phillips head screwdriver.
A sharp knife.
Approximately 136 litres of water.
1 x 20 litre bag of Perlite.
16 x 25 litre bags of good quality
soil or potting mix.

Advertisement

loading

This manual is also suitable for:

14050peuc14050sg/sg14070wall14040wood