Assembly; Version With Flange; Version With Welding End; Heat Treatment Of Weldseams - Igema TG200 Installation And Operation Instruction Manual

Transparent level gauge with ledsecure slim
Table of Contents

Advertisement

7. Assembly

7.1 Version with flange

Respect installation position!
Remove protection caps from connection flanges. Caps only serve as transport
protection.
Ensure that sealing surfaces are clean and undamaged.
Mount transparent level gauge.

7.2 Version with welding end

Respect installation position!
Remove protection caps from connection flanges. Caps only serve as transport
protection.
Assembly only by using welding process 111 and 141.

7.3 Heat treatment of weldseams

Supplementary temper tests of weldseams are not required.

7.4 Drain piping

Close valves (D1, D2, W1, W2) after mounting
Mount drain piping on drain valve (4) (to be provided by the customer).
Ensure that drain piping has free outlet to atmosphere and is protected
from pressure peaks!
Caution

7.5 Illumination device

Only use the lamp in explosion-proofed rooms!
Only skilled and qualified electricians may carry out assembly and
connection of the lamps!
Never insulate illumination devices!
Danger
Mount the illumination device with the fixing elements on the level gauge.
16
.

Advertisement

Table of Contents
loading

Table of Contents