Tru-Jump STR-10FT Assembly, Installation, Care, Maintenance And User Instructions page 21

10ft trampoline with “tru-steel” enclosure and water anchor's
Table of Contents

Advertisement

Step 7 – Spring Assembly
Continue to attach springs in the same manner. For even distribution of tension and ease of assembly,
the springs must be placed on opposite sides of the mat in an alternating manner, i.e. 5 then 32, 11 then
39, 18 then 46, 25 then 53, etc. In addition to the previously installed springs, you should now have
springs at 5, 11, 18, 25, 32, 39, 46 and 53 as shown below.
TRAMPOLINE MAT ASSEMBLY
17

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the STR-10FT and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents