L. Installation Check List
TASK
Preparation
•
Check Operating Location Clearances
•
Test Supply Water Quality
•
Verify Electric Power Requirements.
•
Verify Gas Supply Requirements
•
Verify Exhaust Hood Requirements
Installation
•
Verify SteamChef is Level
•
Check Exhaust Hood Function
•
Check Electrical Supply Connection
•
Check Water Supply Connection
•
Leak Test Water Supply Lines
•
Check Gas Supply Connection
•
Leak Test Gas Supply Connection
•
Check Drain Line Connection
Notes:
Table 2-4 Installation Check List
13
REFERENCE
(Page Number)
3-4
7
9
6
4
5
4
9
8
9
7
7
10
COMPLETED