Installation; Tooling - MG HE Series Manual

Lithium-ion battery module
Table of Contents

Advertisement

8 INSTALLATION

Read the installation instructions in this chapter before commencing installation activities.
Additional information for installation:
-
Installation video:
-
Quick installation guide:
-
Technical drawings
-
Application Notes
WARNING:
Before continuing make sure the following instructions are met:
Ensure that the connection cables are provided with fuses and circuit
breakers.
Never replace a protective device by a component of a different type.
Refer to the ordering information sections of this manual or contact
manufacturer for a correct replacement.
Before switching the device on, check whether the available DC bus
voltage range conforms to the configuration of the product as described
in the manual.
Ensure that the equipment is used under the correct operating conditions.
Never operate it in a wet or dusty environment.
Ensure that there is always sufficient free space around the product.
Install the product in an environment that can sustain some heat. Ensure
therefore that there are no chemicals, plastic parts, curtains or other
textiles, etc. in the immediate vicinity of the equipment.
ELECTRICAL HAZARD:
Wear applicable personal protective equipment when working on a
battery system.
Use insulated tools when working on a battery system.
Make sure the locale health and safety regulations for working on battery
systems are followed.

8.1 Tooling

The required tools during installation are the following:
-
Phillips screwdriver PH1 (insulated);
-
Torque wrench M5 (8 mm) + M8 (13 mm) (insulated);
HE100-150-200
and
HE300
HE100-150-200
and
42
HE300
Innovation in energy storage
Version 2.3 – 21-9-2022

Advertisement

Table of Contents
loading

Related Products for MG HE Series

Table of Contents