NTI Trinity TX Series Installation And Operation Manual page 38

Table of Contents

Advertisement

Boiler and Heating System Piping
Near Boiler Piping (Central Heating – CH)
Figure 10-2(a)
Tx51-200 (non-Combi) – Fitting Identification
Figure 10-2(c)
Tx151C & Tx200C (Combi) – Fitting Identification
Primary Loop
(factory supplied)
38
Boiler Outlet
Boiler Inlet
30 PSI Relief Valve
(factory supplied)
1x1x3/4" Brass Tee
(factory supplied)
¾" Brass Street Elbow
(Factory supplied)
30 PSI Relief
Valve (factory
supplied)
¾" Brass Elbow
(factory supplied)
Boiler Outlet
DHW Outlet
Boiler Inlet
DHW Inlet
Gaskets
(factory supplied)
Pressure Gauge
(factory supplied)
Figure 10-2(b)
Tx51-200 (non-Combi) – CH Piping
Pressure
Relief Valve
Figure 10-2(d)
Tx151C & Tx200C (Combi) – CH Piping
Pressure
Gauge
Tx I&O Manual
Inlet
Outlet
Pressure Gauge
Pressure
Relief Valve
Inlet
Outlet

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents