Recommended Service Clearance - Carrier 50FF 020 Installation, Operation And Maintenance Instructions

Packaged rooftop units
Hide thumbs Also See for 50FF 020:
Table of Contents

Advertisement

7 - POSITIONING AND INSTALLATION

7.7 - Recommended service clearance

Important: This is the minimum space required for maintenance operations and access inside the unit. Depending on the assembly
selected for the unit and the characteristics of the installation site, a larger space around it may be required to ensure proper air
circulation and therefore the correct operation of the unit.
50FF/FC 020-028-037-040-045-047: B1, B2 and BF assemblies
Overall dimension (mm)
50FF/FC
Length
Width
020 to 047
2.225
1.750
50FF/FC 020-028-037-040-045-047: B3, BX, BP and BA assemblies
Overall dimension (mm)
50FF/FC
Length
Width
020 to 047
2.230
1.755
50FF/FC 020-028-037-040-045-047: BT and BB assemblies
Overall dimension (mm)
50FF/FC
Length
Width
020 to 047
2.230
1.760
50FF/FC 020-028-037-040-045-047: BW assembly
Overall dimension (mm)
50FF/FC
Length
Width
020 to 047
2.230
2.565
NOTE:
- Unit not designed to have overhead obstruction.
Service clearance (mm)
Height
A
B
C
1.230
1.200 1.000 1.000 1.600
Service clearance (mm)
Height
A
B
C
1.905
1.200 1.000 1.000 1.600
Service clearance (mm)
Height
A
B
C
1.975
1.200 1.000 1.000 1.600
Service clearance (mm)
Height
A
B
C
1.905
1.200 1.000 1.000 1.600
D
D
D
D
D
D
D
D
C
A
B
C
A
B
C
A
B
C
A
B
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents