Operation; Switching On And Off - Schaudt CSV 410 Instruction Manual

Caravan-charging system
Table of Contents

Advertisement

5.1
5.1.1
5.1.2
Switching on
Switching off
8050102 BA / EN
Operating manual for caravan-charging system CSV 410
5

Operation

The caravan charging system is operated solely from the control and switch
panel connected.
The CSV 410 caravan charging system does not require daily operation.
Initial setting is only needed after the type of battery (lead-acid or lead-gel)
has been changed or during commissioning or when upgrading with acces-
sories (see Section 5.3 and CSV 410 installation instructions).

Switching on and off

Control and switch panels of type LT ...
Control and switch panels of type LT ... are supplied with a separate opera-
ting manual (kept with the vehicle). Please refer to this manual for instruc-
tions on operation.
Switch panel ST02 or ST05HS+PU
Fig. 3
Switch panels ST05 and ST02HS+PU
In the simplest case, an ST05 switch panel is connected to the caravan
charging system. It only has one rocker switch with a centre position. The
optional ST02HS+PU also has a pump switch.
The 12V supply of the living area is switched on using the button. Excep-
tions:
Compressor/AES-refrigerator-control unit
F
These consumers are still operable even when the 12V power supply is swit-
ched off.
 Press rocker switch
sition (ON).
F
The 12V supply to the living area is now switched on.
 Press 12V main switch
The 12V supply to the living area is now switched off.
Date: 20.02.2020
ST05
ST02HS+PU (option)
(12V main switch) so that it is briefly in the "I" po-
so that it is briefly in the "O" position (OFF).
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents