Download Print this page

Procedure 7-1: Pole Mount The 9764 Metro Dock - Alcatel-Lucent 9764 Manual

Metro cell outdoor v1.0 b1 wcdma 1w
Hide thumbs Also See for 9764:

Advertisement

Installation of the 9764 Metro Dock
9764 Metro Dock installation
....................................................................................................................................................................................................................................

Procedure 7-1: Pole mount the 9764 Metro Dock

Purpose
This topic describes the procedures to be followed when installing the Alcatel-Lucent
9764 Metro Dock onto a pole (wooden or metal).
Prerequisites
A site survey has been conducted and a location for the device has been selected that is
both central to the public space and elevated in order to maximize coverage. Before
installation begins you should ensure the following are in place:
• Ensure adequate clearance is provided for service access
• Ground cable has been routed and the site grounding system is in place
• Backhaul cable has been routed and is in place
• Any site specific mounting and anchor materials are available.
Attention: The 9764 Metro Dock must be mounted with the appropriate mounting
hardware suitable for the various supporting structures, building materials and
construction methods. Following a site survey, it is the responsibility of the customer
to ensure that:
• the installation support structure is adequate and compliant with ICC IBC (2012):
• the appropriate mounting hardware and any necessary supporting material is used.
Mounting requirements and materials
The 9764 Metro Dock can be mounted onto a wooden or metal pole. Refer to the
following for the installation kits, anchor materials and tools for the installation type:
• For pole mount refer to,
• For a list of standard tools that may be required to support the installation, refer to
"Tools required for installation" (p. 7-4)
Pre-mount actions
Before mounting the 9764 Metro Dock:
• Record the 9764 Metro Dock 18 digit serial number
• On the 9764 Metro Dock ensure that the Metro Dock spacer is not attached. If the
spacer is present remove it by unscrewing the M5 screw:
....................................................................................................................................................................................................................................
7-14
International Building Code, and all other national and local codes
"Pole mount installation requirements" (p.
Alcatel-Lucent – Proprietary
Use pursuant to applicable agreements
Procedure 7-1: Pole mount the 9764 Metro Dock
7-5).
Alcatel-Lucent 9764 MCO
3MN-01702-0001-RJZZA
Issue 5 June 2014

Advertisement

loading