GE GSM2260VSS Installation Instructions Manual

GE GSM2260VSS Installation Instructions Manual

Ge spacemaker® under-the-sink dishwasher
Hide thumbs Also See for GSM2260VSS:

Advertisement

Available languages

Available languages

GE Consumer & Industrial
Appliances

Installation Instructions

Spacemaker
If you have questions, call 800.GE.CARES (800.432.2737) or visit our website at: www.GEAppliances.com
BEFORE YOU BEGIN
STOP
Read these instructions completely and
carefully.
IMPORTANT
– Observe all governing codes
and ordinances.
• Note to Installer – Be sure to leave these
instructions for the consumer and local inspector's
use.
• Note to Consumer – Keep these instructions with
your Owner's Manual for future reference.
• Skill Level – Installation of this dishwasher requires
basic mechanical, electrical and plumbing skills.
Proper installation is the responsibility of
the installer. Product failure due to improper
installation is not covered under the GE
Appliance Warranty. See warranty information.
• Completion Time – 1 to 3 Hours. New installations
require more time than replacement installations.
• Sink Requirement - This Spacemaker
is designed to be installed under a special shallow
sink. Three types of sinks are available: GPF95, a
single bowl sink with the drain hole on the right
side of the sink; GPF96, a single bowl sink with the
drain hole on the left side of the sink; and GPF97, a
double bowl sink. Purchase these sinks from your
authorized GE appliance dealer.
Dishwasher
®
dishwasher
®
IMPORTANT
– The dishwasher MUST be
installed to allow for future removal from the
enclosure if service is required.
If you received a damaged dishwasher, you should
immediately contact your dealer or builder.
Optional Accessories – See the Owner's Manual for
available custom panel kits.
FOR YOUR SAFETY
Read and observe all CAUTIONS and WARNINGS
shown throughout these instructions. While
performing installations described in this booklet,
gloves and safety glasses should be worn.
READ CAREFULLY.
KEEP THESE INSTRUCTIONS.

Advertisement

Table of Contents
loading

Summary of Contents for GE GSM2260VSS

  • Page 1: Installation Instructions

    Appliances Installation Instructions Spacemaker If you have questions, call 800.GE.CARES (800.432.2737) or visit our website at: www.GEAppliances.com BEFORE YOU BEGIN STOP Read these instructions completely and carefully. IMPORTANT – Observe all governing codes and ordinances. • Note to Installer – Be sure to leave these instructions for the consumer and local inspector’s...
  • Page 2: Drain Hose

    PARTS SUPPLIED IN INSTALLATION PACKAGE: Two 8-18 x 5/8" Phillips head wood screws ■ Junction box cover and #10 hex head ■ screw Drain hose (78" long) and hose clamp ■ Literature, product samples, and/or ■ coupons MATERIALS YOU WILL NEED: WX09X70910 power cord if applicable to ■...
  • Page 3 Installation Preparation–Enclosure PREPARE DISHWASHER ENCLOSURE AND SINK LOCATION • Water line to sink faucet and drain from sink can be run through Area “A.” • Hot water line to dishwasher is installed in Area “B.” • Garbage disposer, water lines to faucet, waste trap, air gap and water shut-off valve are installed in a 12"...
  • Page 4: Prepare Drain Plumbing

    PREPARE DRAIN PLUMBING Drain Requirements • Follow local codes and ordinances. • Drain hose must not exceed 10 feet in length. • A high drain loop or air gap is required. See below. Drain Method The type of drain installation depends on the following: •...
  • Page 5 Installation Preparation–Electrical Supply PREPARE ELECTRICAL WIRING WARNING FOR PERSONAL SAFETY: Remove house fuse or open circuit breaker before beginning installation. Do not use an extension cord or adapter plug with this appliance. ADVERTENCIA PARA SEGURIDAD PERSONAL: Retire el fusible de la casa o abra el interruptor de circuitos antes de empezar la instalación.
  • Page 6 Installation Preparation–Hot Water Supply PREPARE HOT WATER SUPPLY Hot Water Line • The line may enter from either side, rear, or floor within the shaded area shown in Figure F. • The line may pass through the same hole as the electrical cable and drain hose, or cut an additional 1-1/2"...
  • Page 7: Step 2: Check Door Balance

    Dishwasher Installation CAUTION Do not remove the wood base until you are ready to install the dishwasher. The dishwasher will tip over when the door is opened if the base is removed. STEP 1: PREPARATION Locate the items in the installation package and set them aside for use in the listed steps.
  • Page 8: Step 5: Install Power Cord

    The power cord and connections must comply with the National Electrical Code, Section 422 and/ or local codes and ordinances. Maximum power cord length is 6 feet. Power Cord Kit WX09X70910, available for purchase from an authorized GE Appliance Dealer, meets these requirements. Ground Junction...
  • Page 9: Step 8: Position Water Line And Power Supply

    Note: The drain hose supplied with the dishwasher is approximately 78" long. If a longer hose is needed, a 10 foot long hose may be purchased from an authorized GE appliance dealer. The 10 foot long hose is part number GPF10S. Do not use...
  • Page 10: Step 11: Slide Dishwasher Into Cabinet

    Dishwasher Installation STEP 11: SLIDE DISHWASHER INTO CABINET IMPORTANT – Do not push against the front panel with knees. Damage will occur. • Grasp the sides of the front panel and slide the dishwasher into the opening a few inches at a time.
  • Page 11: Step 14: Connect Water Supply

    STEP 13: FASTEN DISHWASHER TO UNDERSIDE OF COUNTERTOP OR SIDES OF CABINET In this step you will need the two 5/8" Phillips head wood screws set aside in Step 1. IMPORTANT – Dishwasher must be centered in cabinet opening. Interference with cabinets or countertop will cause leaks and damage to the door panel and/or control panel.
  • Page 12: Step 15: Connect Drain Line

    Dishwasher Installation STEP 15: CONNECT DRAIN LINE The molded end of the drain hose will fit 5/8" through 1" diameter inlet ports on the air gap, waste tee or disposer. • Determine the size of the inlet port • Cut the drain hose connector on the marked line, if required, to fit the inlet port.
  • Page 13: Step 16: Connect Power Supply

    STEP 16: CONNECT POWER SUPPLY If a power cord with plug is already installed, proceed to Step 17. WARNING If house wiring is not 2-wire with a ground wire, a ground must be provided by the installer. When house wiring is aluminum, be sure to use U.L.
  • Page 14 STEP 19: DISHWASHER WET TEST CHECK LIST Turn on power supply or if power cord is used, ■ plug it into the wall outlet. Latch dishwasher door. ■ Press the “Normal” pad, and then turn control dial ■ just enough to start dishwasher. Be careful not to turn the dial past the first water fill.
  • Page 15 Dishwasher Installation STEP 20: REPLACE ACCESS PANEL AND TOEKICK In this step you will need the panels and the two screws set aside in Step 4. There are two types of screws used. The 8-32 x 1/4" screws are used at the top of the access panel and should still be in place.
  • Page 16 SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE GE Consumer & Industrial General Electric Company imagination at work Louisville, Kentucky 40225 Pub. No. 31-30271 Dwg. No. 206C1559P177 ND 06M-2101 (1/07) GEAppliances.com...
  • Page 17: Avant De Commencer

    Appliances Notice d’installation Lave-vaisselle Spacemaker En cas de questions, appeler le 800.GE.CARES (800.432.2737) ou rendre visite à notre site web : www.GEAppliances.com AVANT DE COMMENCER ARRÊT Lire cette notice d’installation en entier et avec soin. IMPORTANT – Respecter tous les codes et règlements en vigueur.
  • Page 18 PIÈCES FOURNIES DANS LE NÉCESSAIRE D’INSTALLATION Deux (2) vis à bois à tête cruciforme n° ■ 8-18 de 5/8 po Un couvercle de boîte de jonction et une ■ vis à tête à six pans n° 10 Tuyau de vidange de 198 cm (78 po) et ■...
  • Page 19 Préparation pour l’installation - Enceinte PRÉPARATiON DE L’ENCEiNTE Du LAVE- VAiSSELLE ET DE L’EMPLACEMENT DE L’ÉViER • Installer les tuyaux d’alimentation d’eau et de vidange de l’évier dans la section A. • Installer le tuyau d’eau chaude vers le lave- vaisselle dans la section B.
  • Page 20: Préparation De La Plomberie De Vidange

    Préparation pour l’installation - Vidange PRÉPARATION DE LA PLOMBERIE DE ViDANGE Exigences de vidange • Respecter les codes et règlements locaux. • Le tuyau de vidange ne peut pas être plus de 3 m (10 pi) de long. • Une boucle de vidange élevée ou un intervalle d’air est requis.
  • Page 21: Préparation Pour Le Branchement Électrique

    ’ a r m o i r e e n m é t a Trou d’un diamètre Protège-fil maximal de 38 mm (1-1/2 po) Branchement électrique du lave-vaisselle Le branchement électrique se fait à l’avant droit du lave-vaisselle.
  • Page 22 Préparation pour l’installation – Alimentation d’eau chaude PRÉPARATION DE L’ALIMENTATION D’EAU CHAUDE Tuyau d’eau chaude • Le tuyau peut entrer d’un côté ou de l’autre, de l’arrière ou du sol dans la zone hachurée indiquée à la figure F. • Le tuyau peut passer par le même trou que le câble électrique et le tuyau de vidange.
  • Page 23 Installation du lave-vaisselle PRUDENCE Ne pas enlever la palette en bois avant d’être prêt à installer le lave-vaisselle. Le lave-vaisselle bascule lorsque la porte est ouverte sans la base. ÉTAPE 1 : PRÉPARATION Trouver les pièces suivantes dans le kit d’installation et les mettre de côté...
  • Page 24 La longueur maximale du cordon est de 2 mètres (6 pi). Le kit de cordon d’alimentation WX09X70910, en vente chez les distributeurs agréés d’appareils ménagers GE, satisfait à ces critères. Terre Support de boîte Blanc...
  • Page 25 2 mètres de long (78 po). Si nécessaire, un tuyau de 3 mètres (10 pi) est disponible chez les distributeurs agrées d’appareils ménagers GE. Le tuyau de 3 m porte le numéro de pièce GPF10S. Si ce port est Cran d’arrêt de tuyau...
  • Page 26 Installation du lave-vaisselle ÉTAPE 11 : PLACEMENT Du LAVE-VAiSSELLE DANS L’ARMOIRE IMPORTANT – Ne pas pousser contre le panneau avant avec le genou. Ceci peut causer des dommages. • Saisir les côtés du panneau avant et glisser petit à petit le lave-vaisselle dans l’ouverture. Tirer le tuyau de vidange et, le cas échéant, le cordon électrique au travers des trous dans l’armoire adjacente en continuant à...
  • Page 27 Installation du lave-vaisselle ÉTAPE 13 : FixATiON Du LAVE-VAiSSELLE AU-DESSOUS DU PLAN DE TRAVAiL Ou Aux CÔTÉS DE L’ARMOIRE Dans cette étape, il faut utiliser les deux vis à bois à tête cruciforme de 5/8 po mis de côté à l’étape 1. IMPORTANT –...
  • Page 28: Étape 15 : Branchement Du Tuyau De Vidange

    ÉTAPE 15 : BRANCHEMENT DU TUYAU DE ViDANGE L’extrémité moulée du tuyau de vidange se branche sur des orifices d’admission de 5/8 po à 1 po de diamètre de l’intervalle d’air, du té de vidange ou du broyeur de déchets. •...
  • Page 29: Étape 16 : Branchement De L'alimentation Électrique

    Installation du lave-vaisselle ÉTAPE 16 : BRANCHEMENT DE L’ALIMENTATION ÉLECTRIQUE Passer à l’étape 17 si le lave-vaisselle est déjà muni d’un cordon électrique avec fiche. ATTENTION Si le circuit de la maison n’est pas un circuit à 2 fils avec un fil de terre, l’installateur doit installer un fil de terre.
  • Page 30 Installation du lave-vaisselle ÉTAPE 19 : ESSAi Du LAVE-VAiSSELLE AVEC DE L’EAU Mettre le bloc d’alimentation sous tension ou, ■ en cas d’utilisation d’un cordon électrique, le brancher sur une prise murale. Fermer la porte du lave-vaisselle. ■ Appuyer sur la touche « Normal », puis ■...
  • Page 31 Installation du lave-vaisselle ÉTAPE 20 : REMISE EN PLACE DU PANNEAU D’ACCÈS ET DE LA PLINTHE Dans cette étape, il faut utiliser le panneau et les deux vis mis de côté à l’étape 4. Deux types de vis sont utilisés. Les vis 8-32 de 1/4 po sont utilisées en haut du panneau d’accès et devraient toujours être en place.
  • Page 32 LES DONNÉES TECHNIQUES PEUVENT CHANGER SANS PRÉAVIS GE Consumer & Industrial General Electric Company imagination at work Louisville, Kentucky 40225 Pub. N° de publication 31-30271 N° de plan 206C1559P203 GE 07J-2374 (10/10) GEAppliances.com...

This manual is also suitable for:

Gsm2200vwwGsm2200vbbSpacemaker gsm2200v

Table of Contents