Checking The Refrigerant Piping; About Checking The Refrigerant Piping - Daikin VRV 5 REYA8A7Y1B Installer And User Manual

Table of Contents

Advertisement

18.3 Checking the refrigerant piping

18.3.1 About checking the refrigerant piping

REMA5+REYA8~20A7Y1B
VRV 5 heat recovery
4P687640-1 – 2022.07
WARNING
NEVER remove the pinched piping by brazing.
Any gas or oil remaining inside the stop valve may blow off the pinched piping.
6 Wait until all oil has dripped out before continuing with the connection of the
field piping in case the recovery was not complete.
Refrigerant piping works are
finished?
Yes
The indoor units / BS units /
outdoor unit are already
powered ON?
Yes
Use procedure:
"Method 2: After power ON".
It is very important that all refrigerant piping work is done before the units
(outdoor, BS unit or indoor) are powered on. When the units are powered on, the
expansion valves will initialise. This means that the valves will close.
NOTICE
Leak test and vacuum drying of field piping, BS units and indoor units is impossible
when field expansion valves are closed.
Method 1: Before power ON
If the system has not yet been powered on, no special action is required to
perform the leak test and the vacuum drying.
Finish piping work.
No
Use procedure:
"Method 1: Before power ON
No
(regular method)".
18
Piping installation
|
Installer and user reference guide
99

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VRV 5 REYA8A7Y1B and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents