Pipe Work Roughing In Dimensions - Rheem HBT200 Installation Instructions Manual

Collectors with copper waterways, conetite connections for use in direct systems using uncoated dr brass conetite fittings
Table of Contents

Advertisement

PIPE WORK ROUGHING IN DIMENSIONS

Refer to the diagrams for roughing in dimensions for pipe work to the solar
collectors and to the solar storage tank.
remote boost
Solar Storage Tanks 160 Litre (Direct Open Circuit)
Pipe Work to
Solar Storage Tank
VS160 – integrated gas boost
VS160 – remote gas boost
Note:
* Dimensions B and C are 100 mm above fitting.
Integrated Gas Boost and Remote Boost
A
Hot Outlet
937
1434
integrated boost
B
C
Solar Hot
Solar Cold
Flow *
Return *
1139
586
1139
586
VULCAN SOLAR WATER HEATE
SOLAR PIPEWORK ROUGHING IN DIM
26
D
E
Cold Inlet
Gas
104
987
104
-

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hbt200lcsHbt200s

Table of Contents