Installing The Fre-860 Rt Enclosure - PairGain FRE-860 Technical Practice

Remote terminal enclosures
Hide thumbs Also See for FRE-860:
Table of Contents

Advertisement

363-860-100-02, Revision 02
I
NSTALLING THE
The FRE-860 RT Enclosure has external mounting flanges with tapped holes for #10-machine screws for pedestal
mounting
.
1
Remove horizontal crossbars from the UP10900 pedestal prior to mounting the FRE-860.
2
Attach the RT Enclosure to the pedestal frame, using the mounting flanges (see
hardware provided with the RT Enclosure. Follow local practices to ensure a secure mounting.
3
Termination points for Subscriber and HDSL wiring are on the back of the unit as shown in
detailed in
Table
Channel Unit 1
Subscriber Line
1
2
3
4
5
6
7
8
4
Install 5-pin protector plugs for all connected pairs.
FRE-860, FRE-865, FRE-867, and FRE-868
FRE-860 RT E
Figure 2. FRE-860 RT Enclosure and Termination Panel
2.
Table 2. FRE-860 Subscriber Terminations
Channel Unit 2
Circuit
Subscriber Line
1
2
10
3
11
4
12
5
13
6
14
7
15
8
16
March 28, 2000
NCLOSURE
Circuit
Subscriber Line
9
1
2
3
4
5
6
7
8
Installation and Turn-up
Figure
2). Use the mounting
Figure 2
Channel Unit 3
Circuit
17
1
18
2
19
3
20
4
21
5
22
6
23
7
24
8
and
5

Advertisement

Table of Contents
loading

Table of Contents