SCP-PRL771-012-05H
4
Remove the service cable outer jacket from the cable inside the RT enclosure.
5
Strip the insulation from the end of the HDSLRing wire using an insulated handle wire stripper.
6
Carefully insert and loop in a clockwise direction the HDSL Ring wire between the top two washers on the
HDSL binding post. To avoid electrical shock, handle the stripped HDSL wire by it's insulation with
insulated-handle needlenose pliers.
7
Tighten the HDSL binding post nut with an insulated-handle nut driver.
8
Trim any excess uninsulated wire with an insulated-handle wire cutter.
9
Repeat steps 6, 7, and 8 for connecting the HDSL Tip wire to its gas tube protection binding post.
Attach the POTS Drops
To attach the POTS drops:
1
Use a #1 Phillips screwdriver to punch a second small hole in the bottom of the rubber grommet on the
right-hand bottom side of the RT enclosure (see Figure 9).
Cutting the grommet with a utility knife or something similar is not recommended, because this may cause
a large opening in the grommet that would allow insects or other contaminants to enter the enclosure.
2
Lift the appropriate Line Module door (see Figure 9)
PG-Plus PRL-771
Figure 9. Inserting the POTS Wires
January 6, 2003
PRL-771 Overview
11