Welding Vertical Beads And Butt Joints - Miller Shielded Metal Arc Welding Manuallines

Table of Contents

Advertisement

3-15. Welding Vertical Beads And Butt Joints

Single Pass Bead Weld
Whipping Up
Motion
Weave Bead
1/2 in (12 mm)
Wide
Single Pass Vertical Butt Joint Weld Or
First Pass Of Multi-Layer Deposit
90°
Hesitate With
Slight Up And
Down Motion.
Shorten Arc At
Arrowheads
When At Center
Of Weld.
1/2 in
(12 mm)
2
90°
1st Pass
2nd Pass
OR
3rd Pass
Vertical Butt Joint Weld Subsequent Layers
.
When welding vertically,
gravity may distort the mol-
ten metal.
.
This technique is not
1
90°
suitable for all electrodes.
1
Electrode
2
Backing Strip
Weld vertically by carrying the
weld upward or starting at the top
and welding down. Welding up-
ward is easier and is shown in
these illustrations.
Bevel edges if warranted by ma-
terial thickness (see Section
3-11). Tack weld a backing strip
to the plates to make the first
weld pass (root pass) easier.
Arrows Show Lifting Up
Of Electrode And Return
To Crater.
4th Pass
804 260
155 095 Page 17
www.manaraa.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smaw

Table of Contents