Forms; Checklist For Completed Installation - Trane CyberAir DX Installation, Operation And Maintenance Manual

Perimeter precision air conditioners 21-105 kw / 60 hz
Table of Contents

Advertisement

Appendix A

Forms

Checklist for Completed Installation

 Proper clearances for service access have been
maintained around equipment.
 Equipment is level and mounting fasteners (if
applicable) are tight.
 Piping completed to refrigerant or coolant loop (if
required).
 All field installed piping leak tested.
 Refrigerant charge added (if required).
 Condensate pump installed (if required).
 Condensate drain line connected and trap is filled with
water.
 Water supply line connected to humidifier (if
required). If manual cut-off valve is installed, open
valve.
 Humidifier ON/OFF/DRAIN switch is in ON position.
 Plenum box installed (if required).
 Filter(s) installed.
SS-SVX002B-EN
 Ductwork completed or optional plenum installed (if
required).
 Incoming line voltage matches equipment nominal
nameplated rating ± tolerances.
 Main power wiring connections to the equipment,
including earth ground, have been properly installed.
 Customer supplied main power circuit breaker (HACR
type) or fuses have proper ratings for equipment
installed.
 All wiring connections are tight.
 Control wiring connections completed to evaporator
and condenser (if required), including wiring to wall
mounted control panel and optional control devices.
 Foreign materials have been removed from inside and
around all equipment installed (shipping materials,
construction materials, tools, etc.).
 Inspect all piping connections for leaks during initial
operation.