Commissioning; Oil Supply - ABB HT610642 Operation Manual

Table of Contents

Advertisement

Operation Manual / A130-H.. - A140-H..
4 Commissioning / 4.1 Oil supply
4

Commissioning

4.1

Oil supply

4.1.1
Introduction
In all operating states, a functioning and carefully executed oil supply is an important pre-
requisite for trouble-free operation of the turbocharger.
The lubrication of the turbocharger is usually carried out with oil from the engine oil circula-
tion.
Comply with the enginebuilder's specifications regarding the selection of lubricating oil
u
and the oil change intervals.
4.1.2
Oil filtering
Filtering the lubricating oil with a filter mesh width of ≤ 0.034 mm is sufficient for this tur-
bocharger.
4.1.3
Oil pressure
Comply precisely with the oil pressure before the turbocharger for trouble-free operation.
Different oil pressures must be taken into account here for different operating states, such
as, for example, idling mode and when the engine is started.
The admissible values are specified in chapter
4.1.4
Starting the engine for the first time after a
turbocharger or engine overhaul
When starting the engine for the first time after a turbocharger or engine overhaul, proceed
as follows:
Switch on the pre-lubrication pump.
u
Build up oil pressure.
u
Do not exceed a pre-lubrication time of 2 minutes.
u
Start the engine.
u
Let the pre-lubrication pump run until the pump driven by the engine generates sufficient
u
pressure.
© Copyright 2021 ABB. All rights reserved.
Monitoring operation
HZTL4030_EN
→45.
Rev.G
July 2021

Advertisement

Table of Contents
loading

This manual is also suitable for:

A135-h65

Table of Contents