Panduit PAT1M Operation Manual page 38

Automatic cable tie installation system
Hide thumbs Also See for PAT1M:
Table of Contents

Advertisement

PAT1M / PAT1.5M OPERATION MANUAL
NOTE: PDM with software revision earlier than Revision 0.8 (visible on display for 5 seconds during power
"ON"), require the following operator corrective action: (same possible cause and prevention apply).
PDM Software, Revision 0.7 or lower
Tie in Tool
Help
Buzzer
Continue
CORRECTIVE ACTION: Press the BUZZER button to turn the buzzer signal "OFF". Remove the cable tie and
any obstruction from the jaw area and verify the head is clear. Press the CONTINUE button to resume
operation.
PAT1M/PAT1.5M: PA22222A01_03
Page: 36 of 36
Dec., 2007
Downloaded from
Elcodis.com
electronic components distributor

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pat1.5m

Table of Contents