Procedure For Functional Check; Of Replacement Components - ADC AD-50 Installation Manual

Phase 5 / dual timer
Hide thumbs Also See for AD-50:
Table of Contents

Advertisement

PROCEDURE FOR FUNCTIONAL CHECK

OF REPLACEMENT COMPONENTS

1. Microprocessor Controller (Computer) Board
a. Upon completing installation of the replacement microprocessor controller (computer) board, reestablish
power to the dryer.
b. Start the drying cycle.
c. Verify that the motor(s) and the heat indicator dots, in the microprocessor controller (computer) light
emitting diode (L.E.D.) display are on. (Refer to the illustration below.)
d. Verify that motor(s), heat, and door indicator lights on the back side of the microprocessor controller
(computer) board are lit. (Refer to the illustration below.)
113066 - 17
SECTION X
www.adclaundry.com
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ad-50dr

Table of Contents