Steam Information - ADC AD-50 Installation Manual

Phase 5 / dual timer
Hide thumbs Also See for AD-50:
Table of Contents

Advertisement

H. STEAM INFORMATION
It is your responsibility to have ALL steam plumbing connections made by a qualified professional to assure that
the installation is adequate and conforms to local and state regulations or codes.
Care must be exercised when leveling steam dryers into final position. After leveling the dryer, check the
downward pitch of the heat exchanger from front to rear with a level. Likewise, check the downward pitch of
the return condensate manifold toward its outlet part. Absence of these downward pitches will result in probable
water hammer and premature heat exchanger fracture and leakage.
The presence of condensate in the steam will cause water hammer and subsequent heat exchanger failure. The
steam supply connection must be taken from the top of a well-dripped steam main. If the supply to the dryer
exceeds 20 feet (6.1 meters), it should be dripped just before the control valve with a proper trap and dirt
pocket.
IMPORTANT: Failure to comply with the requirements stipulated in this manual can result in
component failure, which will VOID THE WARRANTY.
NOTE: This dryer is manufactured with a pneumatic (piston) damper system, which requires an
external supply of air (80 PSI +/- 10 PSI [5.51 bars +/- 0.68 bars]).
1. Steam Coil PH Level
The normal PH level for copper type steam coils must be maintained between a value of 8.5 to 9.5. For
steel type steam coils the PH level must be maintained between a value of 9.5 to 10.5. These limits are set
to limit the acid attack of the steam coils.
IMPORTANT: Coil failure due to improper PH level will VOID THE WARRANTY.
2. Steam Requirements
Maximum
Heat Input (Normal Load)
Consumption (Approximate) @ 125 PSI
Shaded areas are stated in metric equivalents
* The minimum operating pressure for optimum results is 100 psig (689.47 kPa).
3. Installation Instructions
To ensure an adequate supply of steam is provided, be sure that the steam line and steam return line are
sized and laid out as stipulated in this manual. Inadequate steam line and steam return line or improper
steam plumbing will result in poor performance and can cause component failure. Clean, dry steam must
be provided to the dryer.
IMPORTANT: Steam coil failure due to water hammer by wet steam will VOID THE WARRANTY.
30
OPERATING STEAM PRESSURE
American Dryer Corp.
862 kPa
125
psig*
4.1 Bhp
64.4 kg/hr
142 lb/hr
113066 - 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ad-50dr

Table of Contents