Location Requirements - ADC AD-50 Installation Manual

Phase 5 / dual timer
Hide thumbs Also See for AD-50:
Table of Contents

Advertisement

1. Leveling Dryer
The dryer is equipped with four (4) leveling legs, one (1) at each corner of the base. Two (2) are located
at the rear of the dryer base, and two (2) are located in the lint chamber (coop). To increase bearing life
and improve efficiency, the dryer should be tilted slightly to the rear.
B. LOCATION REQUIREMENTS
Before installing the dryer, ensure the location conforms to local codes and ordinances. In the absence of such
codes or ordinances the location must conform with National Fuel Gas Code ANSI Z223.1/NFPA 54, or in
Canada, the installation must conform to applicable Canadian Standards: Natural Gas and Propane Installation
Code CSA B149.1.
1. The dryer must be installed on a sound level floor capable of supporting its weight. Carpeting must be
removed from the floor area that the dryer is to rest on.
IMPORTANT: "The dryer must be installed on noncombustible floors only."
2. The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.
3. The dryer is for use in noncombustible locations.
4. Provisions for adequate air supply must be provided as noted in this manual (refer to Fresh Air Supply
Requirements in Section D).
5. Clearance provisions must be made from combustible construction as noted in this manual (refer to Dryer
Enclosure Requirements in Section C).
6. Provisions must be made for adequate clearances for servicing and for operation as noted in this manual
(refer to Dryer Enclosure Requirements in Section C).
7. Dryer must be exhausted to the outdoors as noted in this manual (refer to Exhaust Requirements in
Section E).
8. Dryer must be located in an area where correct exhaust venting can be achieved as noted in this manual
(refer to Exhaust Requirements in Section E).
IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.
9. The dryer must be installed with a proper exhaust duct connection to the outside.
10. The dryer must be installed with provisions for adequate combustion and make-up air supply.
CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint build up.
11. The dryer must be installed with adequate clearance for air openings into the combustion chamber.
10
American Dryer Corp.
113066 - 17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ad-50dr

Table of Contents