Battery Installation / Replacement - Napoleon Vittoria GD19P-2 Installation And Operation Manual

Hide thumbs Also See for Vittoria GD19P-2:
Table of Contents

Advertisement

5.3

battery installation / replacement

WARNING
!
Ensure the gas and electrical power to the appliance is turned off.
Appliance may be hot, do not service until the appliance has cooled.
note:
In the event of a power failure, your appliance can be operated using the supplied battery back-up.
Remove the safety barrier to easily access the control compartment.
A.
Turn off the gas and disconnect the electrical power supply from the appliance.
B.
Locate the battery housing inside the valve compartment.
C.
Install 2 "D" alkaline batteries (not supplied) into the battery housing. Ensure the positive and negative
D.
ends correspond with those identified on the holder.
Turn the gas and electrical power back on to begin operating the appliance.
E.
Reinstall the safety barrier. The safety barrier must be installed at all times during operation of the
F.
appliance.
Relay
Red
(+)
Relay located at back left
of appliance.
Control
Module
Black
Battery
(-)
Housing
electrical information
Red (+
)
EN
33
W415-2355 / A / 12.09.20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vittoria gd19n-2Vittoria gd19-1nsb

Table of Contents