Advertisement

INSTALLER: THESE INSTRUCTIONS MUST BE CONVEYED TO AND REMAIN WITH THE HOMEOWNER.
CERTIFIED UNDER CANADIAN AND AMERICAN NATIONAL STANDARDS, CSA 2.22, AND ANSI Z21.50 RESPECTIVELY FOR VENTED GAS FIREPLACE.
GAS - DIRECT VENT MILLIVOLT SYSTEM
f i r e - p a r t s . c o m
WARNING: If the information in these instructions is not followed exactly, a fire or
explosion may result causing property damage, personal injury or death.
Do not store or use gasoline or other flammable vapours and liquids in the vicinity of
• Do not try to light any appliance.
• Do not touch any electrical switch.
• Do not use any phone in your building.
Installation and service must be performed by a qualified installer, service
Fax: (705)722-6031 Email: ask@napoleon.on.ca
Web: www.napoleon.on.ca
INSTALLATION AND OPERATION INSTRUCTIONS FOR
VENTED GAS FIREPLACE
NATURAL GAS MODEL
PROPANE GAS MODEL
CERTIFIED FOR CANADA AND UNITED STATES USING ANSI / AGA / CGA METHODS
FOR YOUR SAFETY
this or any other appliance.
WHAT TO DO IF YOU SMELL GAS:
agency or the gas supplier.
Wolf Steel Ltd., RR#1, 9 Napoleon Rd.,
Barrie, ON., Canada L4M 4Y8 (705)721-1212
GD15 - N
GD15 - P
• Immediately call your gas supplier from
a neighbour's phone. Follow the gas sup-
plier's instructions.
• If you cannot reach your gas supplier,
call the fire department.
R-2000
1
WS-415-179 /01.07.00

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GD15-N and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Napoleon GD15-N

  • Page 1 • If you cannot reach your gas supplier, call the fire department. Installation and service must be performed by a qualified installer, service agency or the gas supplier. Wolf Steel Ltd., RR#1, 9 Napoleon Rd., Barrie, ON., Canada L4M 4Y8 (705)721-1212 Fax: (705)722-6031 Email: ask@napoleon.on.ca R-2000 Web: www.napoleon.on.ca...
  • Page 2: Table Of Contents

    TABLE of CONTENTS PG 2-4 INTRODUCTION PG 13 FINISHING Warranty Door, Louvre & Trim Removal & Installation General Instructions Log Placement General Information OPTIONAL BLOWER Care of Glass & Plated Parts 15-16 OPERATION / MAINTENANCE VENTING Operating Instructions Venting Lengths Maintenance Special Installation Example Air Terminal Locations...
  • Page 3: Warranty

    After the first year, NAPOLEON will not be responsible for installation, labour or any other costs or expenses related to the reinstallation of a warranted part, and such expenses are not covered by this warranty.
  • Page 4: General Instructions

    The glass is 3/16" tempered rent National Fuel Gas Code, ANSI Z223.1, or the current glass available from your Napoleon / Wolf Steel Ltd. dealer. CAN/CGA B149, Installation Codes. Mobile home installa- DO NOT SUBSTITUTE MATERIALS. Clean the glass after...
  • Page 5: Venting

    VENTING VENTING LENGTHS AND AIR TERMI- NAL LOCATIONS Use only Napoleon or Simpson Dura-Vent Model DV-GS venting components. Minimum and maximum vent lengths, for both horizontal and vertical installations, and air termi- nal locations for these installations, are set out in this manual and must be adhered to.
  • Page 6 venting instruction exactly. When a horizontal offset is required in a through-the- Deviation from the minimum or the maximum vertical roof installation, the follow- vent length can create difficulty in burner start-up and/ ing procedure for vent or carboning. FIGURE 4 length calculations must be Vent lengths that pass through unheated spaces (at- followed:...
  • Page 7 AIR TERMIN TERMIN TERMINAL INST TERMIN AL INST AL INSTALLA AL INST ALLA ALLA ALLATIONS: TIONS: TIONS: TIONS: TERMIN AL INST ALLA TIONS: FIGURE 5 INSTALLATIONS CANADIAN U.S.A. 12 INCHES 12 INCHES Clearance above grade, veranda porch, deck or balcony. 12 INCHES 9 INCHES Clearance to windows or doors that open.
  • Page 8: Installation

    FIGURE 3. Installa- follow the venting instructions exactly. tion kits for various roof HORIZONTAL INSTALLATION: pitches are available from your Napoleon This application occurs when dealer. See Accesso- venting through an exterior wall. ries to order the specific 9½"...
  • Page 9: Using Flexible Vent Components

    INSTALLATION USING FLEXIBLE VENT COMPONENTS EXTENDED HORIZONTAL AND COR- For optimum performance, it is recommended that all horizontal runs have a minimum ¼ inch NER AIR TERMINAL INSTALLATION rise per foot. For safe and proper operation of the fireplace, A 45° corner installation must have 6 inch minimum rise follow the venting instructions exactly.
  • Page 10: Using Rigid Vent Components

    3 feet and upper edge of the for both vertical and horizontal runs. Use Napoleon sup- shingles. Ensure that port ring assembly GA-GD-010.370 or equivalent noncom- the air terminal is properly centered within the flashing, bustible strapping to maintain the minimum clearance to giving a 3/4"...
  • Page 11: Mobile Home Installation

    EXTENDED HORIZONTAL AND COR- 7. Remove nails from the shingles, above and to the NER AIR TERMINAL INSTALLATION sides of the chimney. Place the flashing over the air termi- nal and slide it underneath the sides and upper edge of AIR TERMINAL A 45°...
  • Page 12 For corner installation, allow a minimum rise of 6 inches between the fireplace and the air terminal us- ing Napoleon flexible venting components / 0 inch rise FIGURE 19 when using Napoleon rigid venting or Simpson Dura-vent components.
  • Page 13: Finishing

    Optional plated door trim and the arched most grate post and position the top of the log into the door facia are available at your local Napoleon/Wolf Steel f i r e - p a r t s . c o m pocket provided on the rear log (#1).
  • Page 14 OPTIONAL BLOWER INSTALLATION To ease installation of blower, install the blower before installing junction box. THERMODISC INSTALLATION TO BE DONE BY A QUALIFIED IN- FIGURE 32 STALLER and must be electrically connected and grounded RECEPTACLE / in accordance with local codes. In the absence of local JUNCTION BOX codes, use the current CSA C22.1 CANADIAN ELECTRICAL CODE...
  • Page 15: Operation / Maintenance

    OPERATION / MAINTENANCE PURGE THE GAS LINE WITH THE GLASS DOOR REMOVED. OPERATING INSTRUCTIONS After extended periods of non-operation such as fol- When lit for the first time, the fireplace will emit a slight lowing a vacation or a warm weather season, the fire- odour for a few hours.
  • Page 16: Maintenance

    A 5 to 10 second total light-up period is satisfactory. If igni- 1. In order to properly clean the burner and pilot assembly, tion takes longer, consult your Napoleon dealer / distribu- remove the logs to expose both assemblies. tor.
  • Page 17: Replacements

    Contact your dealer or the factory for questions concerning When ordering replacement parts always give the follow- prices and policies on replacement parts. Normally all parts ing information: can be ordered through your Napoleon dealer or distributor. 1. M & S ODEL...
  • Page 18: Accessories

    ACCESSORIES Use only accessories designed for and listed with the GD15 model. PART NO. DESCRIPTION GD-101 WINDSHIELD KIT GD-301 HEAT GUARD GD-303 VINYL SIDING SHIELD GD10.370 WALL SUPPORT ASSEMBLY GZ550-1KT BLOWER KIT GD230-K WEBBED ARCH DOOR FACIA - BLACK GD2-33PB 2"...
  • Page 19: Trouble Shooting Guide

    TROUBLE SHOOTING GUIDE EFORE ATTEMPTING TO TROUBLESHOOT PURGE YOUR UNIT AND INITIALLY LIGHT THE PILOT AND THE MAIN BURNER WITH THE GLASS DOOR REMOVED SYMPTOM PROBLEM TEST SOLUTION - turn on all gas appliances and see if pilot flame flutters, dimin- Pilot goes Gas piping is undersized.
  • Page 20 SYMPTOM PROBLEM TEST SOLUTION Main burner goes Refer to "MAIN BURNER GOES OUT; PILOT STAYS ON" out; pilot goes out. - check for vent blockage. Vent is blocked - check joint seals and installation. Vent is re-circulating 4" flexible vent has become - re-attach to fireplace.
  • Page 21 NOTES: f i r e - p a r t s . c o m WS-415-179 /01.07.00...

This manual is also suitable for:

Gd15-pGd15 - n

Table of Contents