Start-Up & Operating Procedures - Pelsue PELAIR Series Product Manual

Portable air conditioners
Table of Contents

Advertisement

Prior to Operation, the PELAIR Series Portable Air Conditioner should be configured and prepared according to the
following guidelines.
1. Pre-Operation Inspection:
It is necessary to perform a visual inspection, each time, prior to using the product. If deficiencies are found, remove
the product from service and contact the T.A. Pelsue regarding repair. The following checklist coupled with Figure #5.2a
should be used as a guide to determine whether the equipment is in good operating condition prior to usage. Equipment
that is not in good condition can endanger the safety of the entrant and attendant during use.
The Pre-Operation Visual Inspection is not limited to, but must include the following items;
a. Check that the grille on the outlet panel is present and free from obstructions.
b. Remove any objects around the immediate area that could be sucked onto the inlet panel or the lower portion of
the left hand panel where the compressor cooling fan is located.
c. Ensure that electrical components such as the electrical enclosure box, temperature control, and cordset are prop-
erly attached to the air conditioner.
d. Verify that the intake air and condenser air filters are in place and in good condition.
e. Verify that all fasteners are in place and that the wheels are secure on the axle.
ELECTRICAL
BOx
AIR
FILTER
INLET
PANEL
OUTLET
PANEL
#122420-001 - Product Manual: PELAIR SERIES PORTABLE AIR CONDITIONER - Revision 05 - Date: 12-01-2008
5.2 - Start-Up & Operating Procedures
AIR
FILTER
TEMPERATURE
CONTROL
POWER
CORD
Figure #5.2a: PELAIR Portable Air Conditioner
Pre-Operation Inspection Points
COOLING
FAN INLET
Page 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pelair15vPelair30v122421-002122393-002

Table of Contents