Rubber Mat Platform
Installation
Thermo Scientific
1. Place the instrument on a level and firm surface; it must be capable
of supporting the weight and load of the instrument, and the impact
force generated by the motion. Prepare related parts (see Figure 1-3).
1) Rubber mat
2) M4x10 cross recessed countersunk head screws
3) Platform
4) Main body of CO
Figure 1-2. Universal Platform Installation Diagram
2. Install the horizontal platform on the fixed plate of the Main body;
ensure all four mounting holes on the platform and the four threaded
mounting holes are in alignment.
3. Fasten the platform and the fixed plate with four M4x10 cross recessed
countersink head screws.
4. Place the rubber mat on the platform.
resistant shaker
2
Section 1
Unpacking and Installation
CO
Resistant Shaker
1-5
2