Instrument Shut-Down
Daily Shutdown
1
2
3
4
Complete Shutdown
1
2
3
4
5
6
Operation and Maintenance Manual
Toggle off the ozone generator.
Turn off the air regulator (counter-clockwise), located inside Detector door.
Toggle power to "stand-by."
Leave the vacuum pump and Dual Plasma Controller operating at all times.
Toggle off the ozone generator.
Turn off the air regulator (counter-clockwise), located inside Detector door.
Toggle power to STANDBY.
Turn off power to the Dual Plasma Controller.
After 15 minutes, toggle off the vacuum pump, so the Burner cools and
moisture is removed from the system.
Turn off gases to unit.
77