Single Phase - Nuvve EVSE-B-P Series Installation And Setup

Table of Contents

Advertisement

Single Phase

• Connect a dedicated 120V (level I) or 208 – 240V (level II), over-current-protected service
to the two terminals, marked "L1" and "L2/N" in the figure. Connect the ground wire into
the smaller terminal marked "G".
• Critical setting: The three screw terminals for line power, above marked L1, L2/N, G,
must be torqued according to wire size, as shown in the table. Torque units are given in
inch-pounds and in Newton-meters.
• Terminals to the right should already be connected to the EV cable. If not, they must be
installed prior to operation and must be correctly torqued.
Wire Size,
AWG (mm2)
2 (34 mm2)
4-6 (10-25 mm2)
8 (5-10 mm2)
10-14 (2-5 mm2)
Page 10 | Doc #: NU-000032-A, PowerPort Installation & Setup
Torque,
in lb (N•m)
50 in lb (5.6 N•m)
45 in lb (5.1 N•m)
40 in lb (4.5 N•m)
35 in lb (4 N•m)

Advertisement