Preperation For Starting - UPRENT BBA PT 250 Series User Manual

Electric piston pump on the frame
Table of Contents

Advertisement

7

Preperation for starting

1. Take any necessary measures to ensure that the electrical connections and cables cannot be damaged
2. The voltage and frequency must be checked in advance and must match the motor specifications. This
data is shown on the type plate of the motor.
3. Use of the motor without an overload protection switch is not permitted
4. Check whether the motor connection matches the mains voltage. See the type plate for the motor. Check
the connections in the terminal box behind the control panel
5. Check the direction of rotation of the pump
6. Check the oil level in the drive unit (1).
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bba pt250e

Table of Contents