Installation Of The Condensing Unit; Setup; Line Set - Hoshizaki KMS-1230MLH Instruction Manual

Modular crescent cuber serenity series
Hide thumbs Also See for KMS-1230MLH:
Table of Contents

Advertisement

E. Installation of the Condensing Unit

1. Setup

1) Secure the condensing unit to the stand with sixteen M8×16 mm hexagon bolts and M8
nuts as shown in the illustration. See Fig. 5.
) The legs have eight mounting holes. Secure the legs with eight bolts (not included).
3) See the nameplate on the condensing unit. Check that your voltage supplied
corresponds with the voltage specified on the nameplate.
Note: Power to the icemaker is supplied by the condensing unit.
Electrical connections must be made in accordance with national, state and
local regulations. See "F. Electrical Connection."
M8x16mm Bolt

2. Line Set

• Precharged tubing kits, available as optional equipment from HOSHIZAKI AMERICA,
are recommended. Field fabricated line sets are allowed, see instructions below.
• The maximum line length is 55 feet.
• Vertical distance between the condensing unit and icemaker should not exceed 30 feet
above or 10 feet below the icemaker.
• If the vertical distance between the condensing unit and the icemaker is greater than
18 feet, a p-trap (5/8" OD tubing) must be installed in the suction line. The p-trap must
be within 18 vertical feet of both the condensing unit and the icemaker. This will ensure
sufficient oil return to the compressor.
WARNING
M8 Nut
Fig. 5
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Srk-13h

Table of Contents