10. ASSEMBLY
10.1.
ECODENSE Assembly Instructions
ECODENSE condensing boilers are designed to work as CASCADE; they provide suitable space
utilization for every stokehold design at required capacities.
10.2.
ECODENSE Single/CASCADE Assembly Instructions
Ensure that required gas pressure supplied. Check the hydraulic circuit according the PID.
10.3.
Assembly of Condensing Fluid Drain
1. Ensure that siphon is fully filled with water before activation of boiler.
2. Drain direction must allow flow of condensing fluid. Drain pipe must be planned to prevent any
clogging due to external effect like frost, etc. Drain parts must be plastic.
3. Boiler condensing outlet must be at least 19mm.
Condensing drain must not be changed or clogged after assembly. Clogging of condensing drain
causes the boiler to automatically shut down or causes the siphon to overflow. It will be helpful to
pour some hot water to the open parts of drain if there is a possibility of frost. Drain must be open
at all times to ensure proper functioning of the boiler.
Condensing Water Syphon should be cleaned from dust and dirts in every 3 months and also
beginning of every winter.
14.12.2021 Rev. 03