5�1�3�- Major Installation; 5�1�4�- Internal Connection Of Feet - Circutor PVS2 Installation Manual

Hide thumbs Also See for PVS2:
Table of Contents

Advertisement

PVS2
5�1�3�- MAJOR INSTALLATION
Power supply of recharging points in each foot. (AC wiring)
Lowering of strings (DC wiring) per start and central foot.
5�1�4�- INTERNAL CONNECTION OF FEET
CONDUCTION OF DC
WIRING THROUGH THE
BEAMS
STRINGS
Installation Guide
Figure 6: Major installation�
(SEE POINT 7.4)
Figure 7:Internal connection of feet�
EARTH
CONNECTION
15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PVS2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents