11�3�2�2�- Periodicity: annual
Check all the fastening screws of the sail with a torque wrench (base / foot / wing).
Review with normal key of all the screws of the cover (in this case the torque wrench is not
necessary).
Should it be observed that in each revision there are several screws that are not with the
correct tightening torque, it will be necessary to carry out these revisions more frequently and
to try to determine the reason why these screws come loose (excessive vibrations, excessive
clearances or other causes).
11�3�2�3�- Periodicity: every 3 years
Carrying out a repaint every 3 years with Valentine's Oxigel Pavonado paint or similar. Should
rust be detected resulting from highly corrosive environments, by blows or any other cause, a
remediation of the point with rust will be carried out immediately and a product will be applied
to provide sufficiently accredited protection in the affected area.
This periodicity has been determined by the experience of the manufacturer of the paintwork. It
is not an exact period and can be reduced or lengthened depending on the climatic conditions
of the area where it is located.
11�3�3�- CASES THAT INVOLVE SPECIAL REVIEWS
The maintenance manager or the owner must carry out a damage evaluation in the following
scenarios:
• In case of a scale VII earthquake (EMS scale).
• In case of storms whose maximum wind speed exceeds 120 km/h
When 50 kg/m
of accumulated snow is exceeded.
2
• In case of impact of a vehicle, an evaluation of the possible damages received.
• In all cases where it is noted or suspected that the structure may have some damage,
regardless of the cause.
Installation Guide