Loading - Haier HB80 Installation And Operating Instructions Manual

Single door vertical cooler
Table of Contents

Advertisement

2
OPERATION

2.2 Loading

The cooler should be left running for 30 minutes to allow the cabinet
to cool down before loading with product. When loading the cabinet
shelves with product:
• Allow air space around all the product, for even cooling and
efficient operation of the cooler.
• Do not exceed a maximum of 30 kg per shelf.
• Do not allow products to overhang the front or rear of the
shelves, as this will effect air flow.
• Do not obstruct air flow from the evaporator fan.
8
HB80
Single Door Vertical Cooler

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HB80 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents