Initial Maintenance (Im) Operations - freightliner Argosy COE Maintenance Manual

Table of Contents

Advertisement

General Information
The Initial Maintenance table lists all maintenance
operations that are to be performed at the initial
maintenance (IM) interval. Maintenance operation
numbers are reference numbers used to help you
find detailed instructions in this manual on the main-
Maintenance
Operation Number
00–06
Perform all M1 Operations
31–03
Frame Fastener Torque Check
32–03
Suspension U-Bolt Torque Check
33–04
All-Axle Alignment Check
40–01
Wheel Nut and Rim Nut Check
47–03
Fuel Tank Band-Nut Tightening
Table 9, Initial Maintenance (IM) Operations for Service Schedules I, II, III, and IV
Century Class Trucks Maintenance Manual, January 2007
Initial Maintenance (IM) Operations: 00–05
tenance operations to be performed. All operations
listed in the table, along with the operations listed in
the applicable M1 maintenance interval table, must
be performed to complete the initial maintenance
(IM).
Operation Description
00
Check
00/9

Advertisement

Table of Contents
loading

This manual is also suitable for:

C112C120

Table of Contents