Initial Maintenance (Im) Operations - freightliner COLUMBIA CL112 Maintenance Manual

Hide thumbs Also See for COLUMBIA CL112:
Table of Contents

Advertisement

General Information
The Initial Maintenance table lists all maintenance
operations that are to be performed at the initial
maintenance (IM) interval. Maintenance operation
numbers are reference numbers used to help you
find detailed instructions in this manual on the main-
Maintenance
Operation Number
00–06
31–03
31–05
32–03
33–04
40–01
47–03
Table 9, Initial Maintenance (IM) Operations for Service Schedules I, II, III, and IV
Columbia Maintenance Manual, July 2017
Initial Maintenance (IM) Operations for Service Schedules I, II, III, and IV
Perform all M1 Operations
Frame Fastener Torque Check
Premier 690 Coupling Inspection
Suspension U-Bolt Torque Check
All-Axle Alignment Check
Wheel Nut Check
Fuel Tank Band-Nut Tightening
Initial Maintenance (IM) Operations: 00–05
tenance operations to be performed. All operations
listed in the table, along with the operations listed in
the applicable M1 maintenance interval table, must
be performed to complete the initial maintenance
(IM).
00
Check
00/9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Columbia cl120Columbia 2015Cl112 2015Cl120 2015

Table of Contents