Application SW08024: PID Irrigator

Commissioning Overview

Each step must be completed in order shown before proceeding to the next. Before proceeding to power
the ZENER 8000 and operating the pump, check all wiring is correct and that the pump and plumbing
system is in a state fit for operation. If any parameters are changed it is important to 'save changes' when
prompted exiting the menu.
Preparation:
1.
Read all safety instructions & warnings
Install as per instruction manual and this
2.
'Application' guide
Read this application guide carefully and ensure
3.
it meets your requirements
Familiarise yourself with operating the ZENER
4.
8000 and application menus

Preliminary Checks:

5.
Load the application & adjust initial parameters
6.
Operate in local mode to check direction
7.
Check pressure transducer feedback
Operational Check &Fine Tuning:
Operate in remote mode and check PID.
8.
Calibrate PID if required
10.
Check & calibrate 'PIPE FILL' if required
11.
Check overall operation and protection
12.
Save 'Custom Defaults' and/or record settings
Page 2
Document: IM00160A
15/07/19
Refer to the installation manual
Refer to the installation manual and Page 4
of this guide
Go to page 3
Go to page 5 to 11
Go to Page 7
Go to Page 11
Go to Page 11
Go to Page 12
Go to Page 14

Advertisement

Table of Contents
loading

Related Products for Zener 8000

Table of Contents