Download Print this page

Ready Rack FH2G Installation, Operation And Maintenance Manual page 8

Express 2 gear dryer

Advertisement

FH2G – Express Dryer
Installation, Operation and Maintenance Manual
STEP TWO
• Hold MODE/SELECT for up to 5 seconds to turn on panel. ON ENABLE light will turn
Green.
• Press MODE/SELECT once to turn FAN ON ONLY. FAN ON ONLY light will turn Yellow.
• Press MODE/SELECT once more to turn FAN & HEATER ON. FAN & HEATER light will turn
Red.
• Pressing one final time will turn panel OFF.
STEP THREE
• Select the desired equipment to be dried.
o HOSE comes with a pre-set time of 10 Hours
o GEAR comes with a pre-set time of 3 Hours
STEP FOUR
• Adjust time (if necessary) by pressing HOURS or MIN button.
• Use ARROW UP or ARROW DOWN to adjust time.
STEP FIVE
• Start drying by pressing START/STOP BUTTON.
• Unit will automatically turn off at end of cycle.
MAINTAINING DUTY GEAR
Your new drying cabinet is a key part in meeting the NFPA 1851: Standard on Selection Care
and Maintenance of Structural Firefighting Protective Ensembles.
Proper drying is critical for the maintenance and longevity and safety of duty gear. By properly
preparing and utilizing the Firehouse Express Dryer, it is possible to return gear to service
quicker and in better condition than other methods.
Preparation:
• Ensure that the gear has been properly cleaned of all contaminants through the proper
selection and use of detergent and PPE washing systems. Contact Ready Rack for more
information regarding total cleaning cycle products.
7 |
P a g e

Advertisement

loading

Related Products for Ready Rack FH2G

This manual is also suitable for:

Fh6g