Download Print this page
Ready Rack FH2G Installation, Operation And Maintenance Manual

Ready Rack FH2G Installation, Operation And Maintenance Manual

Express 2 gear dryer

Advertisement

Quick Links

FH2G EXPRESS 2 GEAR DRYER
INSTALLATION, OPERATION AND MAINTENANCE MANUAL
REVISION 1 • 2019
www.ReadyRack.com
(800)-991-2120

Advertisement

loading

Summary of Contents for Ready Rack FH2G

  • Page 1 FH2G EXPRESS 2 GEAR DRYER INSTALLATION, OPERATION AND MAINTENANCE MANUAL REVISION 1 • 2019 www.ReadyRack.com (800)-991-2120...
  • Page 2 • Three heavy duty slide out galvanized wire racks, with adjustable positions. • Capable of vented and unvented operation. Unpacking the Express Dryer – FH2G (Two Gear) • Remove shipping crate sides and set aside, taking care not to damage dryer when removing steel corners.
  • Page 3 FH2G – Express Dryer Installation, Operation and Maintenance Manual Figure – Uncrating Dryer Selecting a Location • The two-station dryer should not be located in basements, outdoors or unheated rooms. If adequate air circulation in the space is not available, the unit should be converted to ducted operation.
  • Page 4: Understanding The Model Number

    FH2G – Express Dryer Installation, Operation and Maintenance Manual Levelling the Dryer • The dryer is provided with (4) adjustable feet. These feet can be adjusted using a standard adjustable wrench. If the foot retaining nut or top nut have loosened, they can be re-secured using a 15/16”...
  • Page 5 RR-120-1 → 120V / 1 PH / 60 hZ The FH2G dryer is not configurable as a 208 or 240 supplied unit. For 208 or 240 applications contact Ready Rack for information on FH6G, models RR2401, RR2083 or RR2081 units.
  • Page 6 FH2G – Express Dryer Installation, Operation and Maintenance Manual Converting the Dryer to external Ducting: Drying cabinets work best when the moisture laden air is moved away from the vicinity of the unit. This can be through an external wall or into a larger apparatus bay with suitable air make-up or dehumidification.
  • Page 7 FH2G – Express Dryer Installation, Operation and Maintenance Manual Figure – Top Duct Guard • The diameter of the ducted tube should not be restricted less than 10” in diameter. • Runs longer than 10’ may require the use of a booster fan (not included) to ensure pressure losses are overcome.
  • Page 8 Preparation: • Ensure that the gear has been properly cleaned of all contaminants through the proper selection and use of detergent and PPE washing systems. Contact Ready Rack for more information regarding total cleaning cycle products. P a g e...
  • Page 9 FH2G – Express Dryer Installation, Operation and Maintenance Manual • Boots, gloves and hoods can be placed on either hangers or directly on the mesh shelving units. Ensure each item is straightened and not twisted. • For simple drying activities where the gear has not been soaked or rinsed, pants, jackets and liners can be hung as a set.
  • Page 10: Monthly Inspection

    FH2G – Express Dryer Installation, Operation and Maintenance Manual Post-Drying: • Ensuring that the gear is properly stored is important to maintaining clean and dry and protected. Utilizing a duty gear hanger or locker will ensure the gear is protected from dirt and debris, as well as preventing mildew build-up.
  • Page 11 FH2G – Express Dryer Installation, Operation and Maintenance Manual • Check the door operation for latching and sealing as well as free motion. • Test the heating and cooling cycle. Recommend 15 min FAN AND HEATING (+8-10 F) and 10 min FAN ONLY (-8-10F drop).
  • Page 12: Reference Schematics

    FH2G – Express Dryer Installation, Operation and Maintenance Manual REFERENCE SCHEMATICS 11 | P a g e...
  • Page 13 FH2G – Express Dryer Installation, Operation and Maintenance Manual Reference Fuses: Bussman CC Fuses LP-CC-4.5 – 4.5 AMP 600V LP-CC-5.0 – 5.0 AMP 600V 12 | P a g e...
  • Page 14: Troubleshooting

    FH2G – Express Dryer Installation, Operation and Maintenance Manual TROUBLESHOOTING ISSUE Panel will not power-up Check connection plug / disconnect for damage and connection Ensure MODE/START button is being held for at least 3-5 seconds Check cord termination point inside rear access cover Check 5.0A Fuse behind main control panel...
  • Page 15 FH2G – Express Dryer Installation, Operation and Maintenance Manual 14 | P a g e...

This manual is also suitable for:

Fh6g