FH2G – Express Dryer
Installation, Operation and Maintenance Manual
Check the door operation for latching and sealing as well as free motion.
Test the heating and cooling cycle. Recommend 15 min FAN AND HEATING (+8-10 F) and 10 min
FAN ONLY (-8-10F drop).
Wipe down the interior with a non-caustic solution to remove any residue from washed
equipment.
Check the power connections for frays for damages.
ANNUAL INSPECTION FOR HIGHER VOLUME OPERATIONS (QUALIFIED PERSONNEL)
Properly lock out / tag out power supply.
Disconnect duct and move unit away from the wall.
Remove and inspect inlet covers and heating duct covers.
Clean and remove all debris, dust or cobweb build-up from the heating tunnels.
Check for tightness of all electrical components and fittings. DO NOT OVERTIGHTEN HEATING STRIP
TERMINAL STUDS.
Check unit for level and adjust feet as necessary.
Check the shelves for damage or burrs from wear. Confirm sliders are secure.
Check hanging rail supports for security.
Wipe down the interior with a non-caustic solution to remove any residue from washed equipment.