Download Print this page

Monthly Inspection - Ready Rack FH2G Installation, Operation And Maintenance Manual

Express 2 gear dryer

Advertisement

FH2G – Express Dryer
Installation, Operation and Maintenance Manual
Post-Drying:
Ensuring that the gear is properly stored is important to maintaining clean and dry and
protected. Utilizing a duty gear hanger or locker will ensure the gear is protected from dirt and
debris, as well as preventing mildew build-up.

MONTHLY INSPECTION

Clean and remove all debris and dust from inside the cabinet. Remove plenum from floor and
clean underneath.
Check for missing screws or guards.
Check unit for level and adjust feet as necessary.
Check the shelves and sliders for burrs and wear. Check that the sliders are secure.
Check all hanging rails supports for security.
9 |
P a g e

Advertisement

loading

Related Products for Ready Rack FH2G

This manual is also suitable for:

Fh6g