13 Maintenance

This section gives a brief description of some key maintenance routines necessary for
upkeep of the UPS Solution. For detailed information see the UPS Method Statement
and hardware operating manuals listed in section 1.2.
WARNING: Ensure the safety information at the beginning of this document
before beginning any maintenance procedures

13.1 Periodic inspection

Note any faults or alarms flagged by the Alpha FXM UPS unit. Clear faults and alarms
wherever possible in accordance with UPS Operating Manual – 667/HB/47760/000.
Report ALL faults and alarms to Line Manager.
Switch off the mains supply to the UPS by switching CB1 on the UATS to OFF (see
section 10.2) at the beginning of normal junction periodic inspection. Observe the battery
voltage via the UPS 3-button interface. Wait for voltage to settle and note. Also note time.
Carry out junction periodic inspection as normal. Refer to 667/HA/45950/000 for details.
Observe the battery voltage. Note alongside the time.
Restore the mains supply by switching CB1 on the UATS to ON (see section 10.2).
Note down other key figures from the UPS unit including:
·
Number of mains failures
·
Cumulative inverter time
·
Cumulative kWh output
·
Estimated battery support
Version
7
Last Editor
Ore Oluwatudimu
Document
UPS Solution General Handbook
Name
Copyright ã Siemens plc 2017 All Rights Reserved
Infrastructure and Mobility, Traffic Solutions
Page 57 of 76
Status
TS008468
Date
Doc. No.
Sopers Lane, Poole, Dorset
BH17 7ER
ISSUED
31/01/2017
667/HB/47750/000

Advertisement

Table of Contents
loading

Table of Contents