Installing The System Into The Rack - IBM S922L Installing

Table of Contents

Advertisement

4. Swivel the rail retention bracket so that it locks onto the rack flange (5).
Figure 5. Lock the rail retention bracket onto the rack flange
5. Repeat these steps for the right rail.

Installing the system into the rack

Use the procedure to install the system into the rack.
About this task
Attention:
v Attach an electrostatic discharge (ESD) wrist strap to the front ESD jack, to the rear ESD jack, or to an
unpainted metal surface of your hardware to prevent the electrostatic discharge from damaging your
hardware.
v When you use an ESD wrist strap, follow all electrical safety procedures. An ESD wrist strap is used
for static control. It does not increase or decrease your risk of receiving electric shock when using or
working on electrical equipment.
v If you do not have an ESD wrist strap, just prior to removing the product from ESD packaging and
installing or replacing hardware, touch an unpainted metal surface of the system for a minimum of 5
seconds.
CAUTION:
This system requires three people to install the system into the rack.
To install the system into the rack, complete the following steps:
Procedure
1. Remove the shipping cover on the rear and the front of the system, if present.
6
Power Systems: Installing the IBM Power System S922L (9008-22L)

Advertisement

Table of Contents
loading

This manual is also suitable for:

9008-22l

Table of Contents