Heat & Glo SLF-550TR-IPI-E Owner's Manual page 26

Table of Contents

Advertisement

H
V
Minimum
1
90 Elbow **
2 ft.
1/2 ft.**
152 mm
6 ft.
1-1/2 ft.** 457 mm 10 ft.
2-1/2 ft.** 762 mm 12 ft.
3-1/2 ft.
1.1 m
14 ft.
H
1
V
+ V
+ H
1
2
*No specifi c restrictions on this value EXCEPT V
Fire Risk.
• When using SLP-HRC-SS and SLP-HRC-ZC-
SS termination caps on top vented fi replaces,
a one foot minimum vertical vent section is
required before installing fi rst elbow.
• When using DVP-TB1 termination cap on top vented
fi replaces, a three foot minimum vertical vent section is
required before installing fi rst elbow.
Figure 7.6
26
Top Vent - Horizontal Termination
Venting with three 90º elbows
+ H
Maximum
1
2
SLF-550TR-IPI-E
V
2
610 mm
*
1.8 m
*
3.0 m
*
3.7 m
*
4.3 m
*
+ H
MAX. =14 ft. (4.6 m)
2
+ H
MAX. = 40 ft. (12.2 m)
1
2
+ V
1
exceed 40 ft. (12.2 m)
** See warning below
H
2
WARNING **
Heat & Glo • SLF-550TR-IPI-E • 2118-901 Rev. B • 7/12
V
+ V
Min.
1
2
*
*
*
*
*
+ H cannot
2
V
2
Note: Use SLP Series
components only.
Note: There MUST be a 25%
reduction in total H when using
fl ex vent except when using the
simple up and out installation
(see Figure 7.3).
H
1
V
1

Advertisement

Table of Contents
loading

Table of Contents