Summary of Contents for Pulsar Green Power HPSB 3512C
Page 1
HPSB 3512C v.1.0 HPSB 13,8V/3A/17Ah Buffer, switch mode power supply unit. Edition: 8 from 24.10.2016 Supersedes edition: 7 from 11.08.2014...
Page 2
GREEN POWER www.pulsar.pl HPSB3512C Features: LED indication DC 13,8V/3A uninterruptible power supply protections: fitting battery: 17Ah/12V wide range of mains supply: 176÷264V SCP short-circuit protection OVP overvoltage protection high efficiency 76% ...
Page 3
GREEN POWER www.pulsar.pl HPSB3512C 1. Buffer power supply unit HPSB 13,8V/12V/6x0,5A/7Ah. - HPSB3512C + RN500 (13,8V/12V) + LB8 6x0,5A (AWZ580 or AWZ578) + 7Ah 2. Buffer power supply unit HPSB 13,8V/2x5V÷7,4V/2x2A/7Ah. - HPSB3512C + 2xDCDC20 (2x5V÷7,4V/2x2A) + 7Ah 3. Buffer power supply unit HPSB 13,8V/5V÷7,4V/4x0,5A/7Ah.
Page 4
GREEN POWER www.pulsar.pl HPSB3512C Fig.2. The view of the PSU.
Page 5
GREEN POWER www.pulsar.pl HPSB3512C 1.4 Technical parameters: - electrical parameters (tab.3) - mechanical parameters (tab.4) - operation safety (tab.5) - operation parameters (tab.6) Electrical parameters (tab. 3) PSU type A (EPS - External Power Source) 176÷264V AC Mains supply Current up to 0,6A@230VAC 50÷60Hz...
Page 6
GREEN POWER www.pulsar.pl HPSB3512C Operation safety (tab.5) Protection class PN-EN 60950-1:2007 I (first) Protection grade PN-EN 60529: 2002 (U) IP20 Electrical strength of insulation: - between input input and output circuits of the PSU (I/P-O/P) 3000 V/AC min. - between input circuit and PE protection circuit (I/P-FG) 1500 V/AC min.
Page 7
GREEN POWER www.pulsar.pl HPSB3512C 2.2 Installation procedure. 1. Before installation, cut off the voltage in the 230V power-supply circuit. 2. Mount the PSU in a selected location and connect the wires. 3. Connect the power cables (~230Vac) to L-N clips of the PSU. Connect the ground wire to the clip marked by the earth symbol PE.
Page 8
CAUTION! The power supply unit is adapted for cooperation with the sealed lead-acid batteries (SLA). After the operation period they must not be thrown but recycled according to the applicable law. Pulsar sp. j. Siedlec 150, 32-744 Łapczyca, Poland Tel. (+48) 14-610-19-40, Fax. (+48) 14-610-19-50 E-mail: biuro@pulsar.pl,...
Need help?
Do you have a question about the Green Power HPSB 3512C and is the answer not in the manual?
Questions and answers