Rinnai Demand Duo CHS199100CUiP Installation And Operation Manual page 12

Commercial hybrid water heating system
Table of Contents

Advertisement

CLEARANCES
Location
Top
Bottom (Ground)
Front
Back
Sides (Left and Right)
0 in. Minimum
12
2 in. (51 mm)
(0 in. from vent components)
** Clearance for servicing the anode rods is 54 in. from the top of
the water heater
0 in.
6 in. (152 mm)
* Clearance for servicing is 24 in. (610 mm) in front of water heater
0 in.
0 in.
0 in. Minimum
0 in. Minimum
*6 in. Minimum
Rinnai Commercial Hybrid System Installation and Operation Manual
Clearance
** 12 in. Minimum
Door

Advertisement

Table of Contents
loading

This manual is also suitable for:

Demand duo chs199100cuDemand duo chs199100cuin

Table of Contents