Mega Ohm Measurement(Insulation Measurement); Acv Measurement - Aktakom AM-2002 Operation Manual

Insulation tester
Table of Contents

Advertisement

5-2 Mega OHM Measurement(Insulation
Measurement)
* Do not touch the input terminals & the test
lead's pins during the measurements.
* Do not apply external voltage to input terminals
at any time.
1. Connect the RED test plug into "Hi terminal"(3-5,
Fig. 1)
Connect the BLACK test plug into "Lo terminal"(3-5,
2.
Fig. 1)
3. Rotate the "Function/Range Switch"(3-2, Fig. 1) to the
"200M ohm/100V", "200M ohm/250V", "200M ohm/500V"
or "1000M ohm/1000V" position according the user's
requirement.
4. Connect the test ALLIGATOR CLIPS into the circuit
under test.
5.
Push the "Test Button"(3-4, Fig. 1) for measurement.

5-3 ACV Measurement

1. Connect the RED test plug into "ACV terminal"(3-5, Fig. 1)
Connect the BLACK test plug into "COM terminal"(3-5,
2.
Fig. 1)
3. Rotate the "Function/Range Switch"(3-2, Fig. 1) to the
"600 ACV" position.
* Do not apply the overload voltage
to the input terminals !
6

Advertisement

Table of Contents
loading

Table of Contents