SERVICE & INSTALLATION MENU
Element
Optional function
q8
Not used
q9
Not used
qA
Not used
qb
Operation mode with setback
Temperature differential for
qC
the setback function
Minimum stop time of
qd
setback
qE
Setback mode
Operation state after the end
qF
of setback operation
r1
Dual setpoint
54
PMML0565 rev.1 - 04/2022
Individual
Settings
setting
00
-
-
01
00
-
-
01
00
-
-
01
00
Disabled
01
Cooling
X
02
Heating
03
Cooling/Heating
00
2.0°C
01
3.0°C
X
02
4.0°C
03
5.0°C
04
1.0°C
00
10 minutes
01
20 minutes
02
30 minutes
03
40 minutes
04
50 minutes
05
60 minutes
X
06
70 minutes
07
80 minutes
08
90 minutes
09
100 minutes
10
110 minutes
11
120 minutes
00
Always
01
Input
X
02
Schedule
03
Manual
00
Stop
01
Run
X
Operation state before the beginning of
02
setback
00
Function disabled (factory setting)
X
01
Function enabled
Setting conditions
Description
Use at 00 conditions
Use at 00 conditions
Use at 00 conditions
Operation modes in which
setback operation is activated to
keep a minimum comfort in the
room while it is not occupied.
Target temperatures for both
cooling and heating operation
are determined versus a
temperature to start setback
operation (rE, rF)
Target temperature calculation:
Target temperature in cooling
mode: rF - qC (°C)
Target temperature in heating
mode: rE + qC (°C)
To avoid the frequent activation
of setback operation, a
minimum off-time shall pass
from the end of setback
operation until the beginning of
the following setback operation.
Even if room temperature
reaches the setpoint to start
setback operation, setback
operation does not start until the
minimum off-time has expired.
When selecting "01: Input",
it is necessary to set up one
input contact (i1 or i2) with
the setback function "09". This
operation has to be done in the
input/output setting menu of the
remote controller.
When selecting "02: Schedule"
or "03: Manual", additional
settings are required.
Operation state to switch
to upon the end of setback
duration.
This function allows the setting
of independent setpoints for
cooling and heating in the
automatic cooling/heating mode.